Current Location: HOME /Knowledge /vertical turbine pump
Demolition of LC Vertical Long Shaft Semi-submersible turbine Pumps
The disassembly sequence of LC vertical long shaft pump can be basically carried out in reverse of the assembly sequence. When disassembling LC vertical long shaft pump, the following points should be noted:
(1) Make matching marks at the necessary matching points to facilitate the next installation of LC vertical long-axis Semi-submersible turbine pump.
(2) Prepare some boxes, assemble and disassemble the parts, in order to prevent loss or scratch, fasteners are put separately.
(3) The following parts can not be reused, and spare parts need to be prepared: O-ring, paper cushion, rusty fastener, spring washer, filler.
Scan and add WeChat
TEL:
008618507312158 Xiangyin Industrial Park, Jinlong Town, Xiangyin County, Hunan Province, China susie@hnljpump.comHotline:
008618507312158
008613974960765